1
/
of
0
North East Pet Shop
20 Meter Long Lead
20 Meter Long Lead
Regular price
£35.98 GBP
Regular price
£29.99 GBP
Sale price
£35.98 GBP
Taxes included.
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
This 20 Meter Long Lead is designed with reflective material for increased visibility and is made with strong, durable materials for long-lasting use.
Ideal for long walks or training sessions, this lead provides both safety and convenience for you and your pet.